Manufacturing & Warehouse Facilities

Callback Request

    modulift parts
    yellow tick

    Cutting

    yellow tick

    Machining

    yellow tick

    Welding

    yellow tick

    Shotblasting

    yellow tick

    Painting

    yellow tick

    Inspection / Testing

    Test Rig

    yellow tick

    Full Manufacturing Survey e.g. DNV CG3 Certificate/ILO 152 Form No.3.

    yellow tick

    MPI of all welds conducted by an independent third party before and after the Proof Load Test - with an associated MPI Report.

    yellow tick

    Proof Load Testing witnessed and certified by a DNV surveyor (or other verification body as preferred), with a Survey Report provided.

    yellow tick

    Proof Load Testing witnessed by a customer appointed person or inspector.

    piping being lifted within warehouse