A custom-made 50 WLL lifting frame designed by Modulift was key in being used to ensure that Mocean Energy’s new Blue X wave energy prototype could take it’s first ever dip in to the cold waters of the North Sea.
Mocean Energy, a key player in the wave energy industry, who have been operating since 2015; have been working on turning their concept in to a reality for the past three and half years. The 20-metre long, 38-tonne wave machine (Blue X) is a prototype design that was manufactured with funding from Wave Energy Scotland’s Novel Wave Energy Converter programme.